Ведомость ремонта
Main Particulars Built in... Type... Deadweight... Length overall... Breadth... Depth moulded... Freeboard... Loaded draft... Loaded displacement... Light ship draft (average)... Power plant Main Engine... power... B.H.P. Propeller 4-blades, dia.... mm, weight... tons Tailshaft length... mm, weight... tons, dia.... mm Intermediate shaft length... mm, dia.... mm Rudder stream-lined, semi-balanced... kg, blade area... sq.m Hull specification Main Deck Two deckbeams to be cropped and partly renewed... m Five deckbeams brackets to be renewed. Two mooring pipe to be removed and refitted. Two airpipes to be renewed. Bulwark to be cropped and partly renewed... mm Three bulwark stations to be removed and refitted. Bulwark to be faired... mm Three bits and deck plating under them to be renewed. Cargo derrick to be removed and straightened, refitted and tested. Main deck to sandblast 30%, standard SA-2.0 then to flush with fresh water. To apply primer 2 coatings... sq.m To apply red deck paint 2 coatings... sq.m Winch/windlass brake band to be replaced. Cargo Holds Nos.... To renew the bent steps for all ladders in holds... pcs To weld up the crack in hold No....... mm The surface of cargo holds to be sandblasted, standard SA-2.0... sq.m To apply primer on all surfaces of the holds... sq.m Hatch Cover Nos.... To remove the cover to the shore... pcs Hatch cover No.... to be faired. To sandblast 40%, standard SA-2.0... sq.m To apply primer 2 coatings... sq.m To apply all holds and hatch covers food-grade paint... sq.m To renew rubber gasket (packing)... m To reinstall the covers... pcs To hose test the covers as per the R.S. requirements... pcs Superstructure To be mechanically chipped 20%... sq.m The chipped areas to apply primer 2 coatings... sq.m To apply white paint 2 coatings... sq.m Porthole glasholder with glass to be replaced... pcs Two window to be renewed. Steel watertight door to be faired and waterproof tested. Overhead ceiling to be removed and then refitted... sq.m Accommodation Ladder To remove to workshop... pcs To fabricate and renew stanchions... pcs, steps... pcs To reassemble the accommodation ladder, to install on board... pcs To test accommodation ladder with davits under proof load... pcs Mechanical Part Main Engine To remove the Cylinder Cover Nos.... To extract cylinder liners... pcs To carry out the inspection of beads for defect... pcs To submit for inspection to surveyor. To calibrate the Liners before extraction and after reassembling... pcs To check centering. Block Bearings of cylinders Nos.... To unbolt the block bearings... sets To remove the upper and lower parts of bearings... sets To fabricate gaskets... pcs To reassemble, to paint-fit and to establish clearances... Crank Bearing of Cylinder Nos.... To open the Bearing... sets To reassemble the bearings, to establish clearances... sets To polish the pins if necessary... sets Diesel-generator... power... kW To disconnect piping and fittings. To remove cylinder cover. To take out piston. To extract cylinder liners. To take out main bearings. To open the turbocharger. After dismantling - all parts to be cleaned, to be inspected for defects, to take readings. To renew the defective parts. To submit for inspection to surveyor. To reassemble and commission the engine. Steam condenser To remove covers. To clean the tubes from steam side and sea water side... pcs To renew protectors, gaskets, bolts and nuts. To clean the covers and to apply epoxy composition coating. Condenser to be reassembled and to pressure. To submit for inspection to surveyor. Electric Part Cable Way To repack the cable glands i.w.o. to the upper deck. Fire Alarm Station To carry out trouble-shooting of defective detectors in cargo holds and to replace them by new ones... pcs To renew the protection pipes i.w.o. cargo hold coamings total length... m,... pcs To commission the station. Electric Motor... To open the motor, to clean, to dry winding, to warnish them. To renew bearings... pcs To reassemble, to commission.
|