Разделы: Автомобили Астрономия Биология География Дом и сад Другие языки Другое Информатика История Культура Литература Логика Математика Медицина Металлургия Механика Образование Охрана труда Педагогика Политика Право Психология Религия Риторика Социология Спорт Строительство Технология Туризм Физика Философия Финансы Химия Черчение Экология Экономика Электроника

APPENDIX N – PROJECTS COMPLETED BY MOSTOTREST IN 2009-2012






Project Geographic place Project-end date Key particularities
The extension of Avtozavodskaya subway line in Nizhniy Novgorod from Moskovskaya to Gorkovskaya stations Nizhniy Novgrod   Constructing the first underground line using modern underground construction technologies Construction is being conducted in complex geological conditions and in dense urban conditions
Stadium Intersection Sochi   The construction of the new interchange will manage the transit flows of vehicles outside dense urban areas improving transport connections to the peripheral regions of Sochi and highway M-27 Dzhubga Sochi.
Adler Ring Intersection Sochi   The new two-level Adler Ring intersection will provide a vehicle link from the area between the railway station, federal highway M-27 Dzhugba-Sochi in both directions to Sochi airport and the mountain cluster.
Vladivostok airport Vladivostok, Primorskiy krai   Construction work conducted without closing the airport
Highway between Alpika-Service and Roza-Khutor Krasnodar krai   Construction work is being conducted in a mountainous area with significant altitude difference Use of innovative technologies and specialised machinery
Vladivostok-Nahodka-Port Vostochniy highway Primorskiy krai   Construction work on marshy ground Construction work is taking place in an area with poor soil bearing capacity, which is to be replaced with rock, and a newly built embankment
Bridge across Don river at Sivers str Rostov-on-Don   The spans over the Don river are being constructed using incremental launching techniques The concrete for the overpass slabs has been held in place using modern timbering machinery. The method allows construction to be significantly speeded up increasing productivity
Road bridge over the Angara River Irkutsk   Construction work was conducted in harsh climate conditions For the first time in Russia 105 meter add-on concreting was used
Cable-stayed bridge over the Oka River By passing Murom   Cable bridge with a total length of 1,400m The first, and only, three-pylon bridge in Russia
Section of the M-4 ‘Don’ highway Tula   Certain areas are characterised by changes in ranges of altitude and angles of ascents and descents, as well as round-offs (with a visibility of not less than 300 m)
Logistics center – Industrial park ‘Vostochny’ Nogisk, Moscow region   One of the largest industrial parks in the Moscow region Full integration of the park with road and rail infrastructure

Source: Company data

APPENDIX O – MOSTOTREST’S CURRENT PROJECTS (1/2)

Project Implementation period Geographic place Key particularities
Construction of a section of the fourth transport ring between Shosse Entuziastov highway and Izmailovskoe highway in Moscow 2008-2015 Moscow Construction takes place on active highways and railways Nearly one third of expenses is for shifting utilities networks
Golubye Dali Intersection, Sochi 2009-2013 Sochi The intersection will ensure the smooth movement of vehicles from Sochi towards the centre of Adler and back, as well as from the center of Adler to the Golubye Dali district, passing the Adler Ring It is being conducted in compliance with modern ecological standards with local facilities treating storm sewage water. In addition noise control screens and seismic devices made by Maurer will be installed at the intersections.
Construction of a section (15-58 km) of Moscow - St.Peterburg toll highway 2010-2014 Moscow-St.Petersburg It is a first toll highway in Russia
A secondary road along Kurortnyi avenue in Sochi, Stages 2,3 2010-2013 Sochi Construction in the mountain area at the height of 2,208 m, with 25-meter viaducts
Overhaul, maintain and rehabilitate a segment of M-4 Don Highway 2011-2013 Voronezh Region Upgrade the existing and build a new automobile bridges over the Voronezh River, with the total length of 360 m each, and build seven split-level traffic interchanges.
Rebuilding traffic interchange at intersection of Leningradskoye avenue and Moscow ring road 2011-2013 Moscow The project envisages the building of new two-lane flyovers with the total length of 2 km, to ensure a left-turn exit from Leningradskoye Avenue immediately after the Canal of Moscow bridge, an MRR access road after the Butakovski Bay bridge and a right-turn exit road from Leningradskoye Avenue onto the MRR’s interior side.
Ryzan North bypass 2011-2013 Ryzan Сonstruction of a 3.8 km four-lane automobile road, a pivot span automobile bridge over the Trubezh River, an overpass, a flyover and two traffic interchanges with three additional flyovers.
Rebuilding a segment of M-11 Narva Highway (Ust-Luga commercial seaport access road) between km 16 – km 40 2011-2014 Leningrad region Construction of a 28.7 km-long Grade 2 road with up to 4 traffic lanes, as well as 8 engineered structures, including a bridge over the Khabalovka River, a bridge over the Kyamishi River, three railway overpasses and three traffic interchanges.
Northern Moscow Businovskaya Traffic Interchange 2011-2014 Moscow The interchange will be built on the pre-toll segment of the Moscow – Saint Petersburg Highway and in the future will become an integral part of the Northern Link – through highway crossing Moscow from East to North, bypassing the center. The interchange will minimize traffic flow intersection points, in particular, by offering unidirectional flyovers and acceleration lanes, and will significantly boost the traffic junction throughput capacity.
Moscow – Saint Petersburg Highway 15 – 58 km Head Segment 2011-2014 Moscow-St.Petersburg Construction in dense Moscow suburb environment, including in the towns of Khimki and Zelenograd Multi-level environmental compliance control by Mostotrest and Vinci Project Management Team (VPMT) environmental compliance experts.
Rebuilding segment of M-9 Baltiya Highway, Stage 1 2011-2015 Moscow region The project will bring the segment's width to 6-10 lanes, with separated traffic ways in both directions.

Source: Company data

APPENDIX O – MOSTOTREST’S CURRENT PROJECTS (2/2)

Project Implementation period Geographic place Key particularities
Segment of M-11 “Moscow – Saint Petersburg” Highway in the Tver Region (Vyshny Volochek bypass) 2011-2015 Moscow-St.Petersburg Stage 1 construction of the km 258 – km 334 (Vyshny Volochek Bypass) segment of the Moscow – Saint Petersburg Highway (M-11) in the Tver Region. As part of the 72 km-long segment construction project, Mostotrest will build 54 engineered structures, including 40 overpasses, 14 bridges and 2 split-level traffic interchanges at intersections with the existing M-10 «Moscow – Saint Petersburg Highway». Project Stage 2 envisioning operation, maintenance and scheduled repairs of the toll segment will stretch over 18 years after the completion of construction.
M-9 «Baltiya» Highway segment overhaul 2012-2013 Tver region The company will lay bituminous concrete road carpet, fortify and extend roadsides, re-arrange car stop areas and erect metal road safety barriers. Traffic way width upon completion of the project will be 7 m, design speed: 100 km/h.
Petropavlovsk-Kamchatski airport Upgrade 2012-2013 Kamchatskiy krai Upgrade pavement of the main high-speed taxiway, Runway 1, taxiways, passenger apron, aircraft parking positions, taxiway junctions with the runway and the main high-speed taxiway with the Defense Ministry aircraft parking positions. During the construction will be used the modern machinery and technology, which will allow to accelerate construction and significantly improve the quality and wear life of the infrastructure.
A bridge crossing over the Don River on M-4 «Don» Highway 2012-2014 Rostov region The total length of the new bridge crossing will be 1,227.7 m,, including a three-lane one-way bridge with the length of 567.11 m.
Upgrade of the km 0 – km 16 segment of M-11 “Narva” Highway access to the Ust-Luga Port 2012-2015 Leningrad region In accordance with the contract provisions, Mostotrest will build three overpasses with access roads between km 0 – km 16 segment. Highway design speed upon completion of the project:120 km/h.
Segment of M-11 “Moscow – Saint Petersburg” Highway in the Tver Region (Vyshny Volochek bypass) 2011-2015 Moscow-St.Petersburg Stage 1 construction of the km 258 – km 334 (Vyshny Volochek Bypass) segment of the Moscow – Saint Petersburg Highway (M-11) in the Tver Region. As part of the 72 km-long segment construction project, Mostotrest will build 54 engineered structures, including 40 overpasses, 14 bridges and 2 split-level traffic interchanges at intersections with the existing M-10 «Moscow – Saint Petersburg Highway». Project Stage 2 envisioning operation, maintenance and scheduled repairs of the toll segment will stretch over 18 years after the completion of construction.
M-9 «Baltiya» Highway segment overhaul 2012-2013 Tver region The company will lay bituminous concrete road carpet, fortify and extend roadsides, re-arrange car stop areas and erect metal road safety barriers. Traffic way width upon completion of the project will be 7 m, design speed: 100 km/h.
Petropavlovsk-Kamchatski airport Upgrade 2012-2013 Kamchatskiy krai Upgrade pavement of the main high-speed taxiway, Runway 1, taxiways, passenger apron, aircraft parking positions, taxiway junctions with the runway and the main high-speed taxiway with the Defense Ministry aircraft parking positions. During the construction will be used the modern machinery and technology, which will allow to accelerate construction and significantly improve the quality and wear life of the infrastructure.
A bridge crossing over the Don River on M-4 «Don» Highway 2012-2014 Rostov region The total length of the new bridge crossing will be 1,227.7 m,, including a three-lane one-way bridge with the length of 567.11 m.
Upgrade of the km 0 – km 16 segment of M-11 “Narva” Highway access to the Ust-Luga Port 2012-2015 Leningrad region In accordance with the contract provisions, Mostotrest will build three overpasses with access roads between km 0 – km 16 segment. Highway design speed upon completion of the project:120 km/h.
Segment of M-11 “Moscow – Saint Petersburg” Highway in the Tver Region (Vyshny Volochek bypass) 2011-2015 Moscow-St.Petersburg Stage 1 construction of the km 258 – km 334 (Vyshny Volochek Bypass) segment of the Moscow – Saint Petersburg Highway (M-11) in the Tver Region. As part of the 72 km-long segment construction project, Mostotrest will build 54 engineered structures, including 40 overpasses, 14 bridges and 2 split-level traffic interchanges at intersections with the existing M-10 «Moscow – Saint Petersburg Highway». Project Stage 2 envisioning operation, maintenance and scheduled repairs of the toll segment will stretch over 18 years after the completion of construction.

Source: Company data







Дата добавления: 2015-09-07; просмотров: 432. Нарушение авторских прав; Мы поможем в написании вашей работы!



Практические расчеты на срез и смятие При изучении темы обратите внимание на основные расчетные предпосылки и условности расчета...

Функция спроса населения на данный товар Функция спроса населения на данный товар: Qd=7-Р. Функция предложения: Qs= -5+2Р,где...

Аальтернативная стоимость. Кривая производственных возможностей В экономике Буридании есть 100 ед. труда с производительностью 4 м ткани или 2 кг мяса...

Вычисление основной дактилоскопической формулы Вычислением основной дактоформулы обычно занимается следователь. Для этого все десять пальцев разбиваются на пять пар...

Правила наложения мягкой бинтовой повязки 1. Во время наложения повязки больному (раненому) следует придать удобное положение: он должен удобно сидеть или лежать...

ТЕХНИКА ПОСЕВА, МЕТОДЫ ВЫДЕЛЕНИЯ ЧИСТЫХ КУЛЬТУР И КУЛЬТУРАЛЬНЫЕ СВОЙСТВА МИКРООРГАНИЗМОВ. ОПРЕДЕЛЕНИЕ КОЛИЧЕСТВА БАКТЕРИЙ Цель занятия. Освоить технику посева микроорганизмов на плотные и жидкие питательные среды и методы выделения чис­тых бактериальных культур. Ознакомить студентов с основными культуральными характеристиками микроорганизмов и методами определения...

САНИТАРНО-МИКРОБИОЛОГИЧЕСКОЕ ИССЛЕДОВАНИЕ ВОДЫ, ВОЗДУХА И ПОЧВЫ Цель занятия.Ознакомить студентов с основными методами и показателями...

Влияние первой русской революции 1905-1907 гг. на Казахстан. Революция в России (1905-1907 гг.), дала первый толчок политическому пробуждению трудящихся Казахстана, развитию национально-освободительного рабочего движения против гнета. В Казахстане, находившемся далеко от политических центров Российской империи...

Виды сухожильных швов После выделения культи сухожилия и эвакуации гематомы приступают к восстановлению целостности сухожилия...

КОНСТРУКЦИЯ КОЛЕСНОЙ ПАРЫ ВАГОНА Тип колёсной пары определяется типом оси и диаметром колес. Согласно ГОСТ 4835-2006* устанавливаются типы колесных пар для грузовых вагонов с осями РУ1Ш и РВ2Ш и колесами диаметром по кругу катания 957 мм. Номинальный диаметр колеса – 950 мм...

Studopedia.info - Студопедия - 2014-2024 год . (0.013 сек.) русская версия | украинская версия