Разделы: Автомобили Астрономия Биология География Дом и сад Другие языки Другое Информатика История Культура Литература Логика Математика Медицина Металлургия Механика Образование Охрана труда Педагогика Политика Право Психология Религия Риторика Социология Спорт Строительство Технология Туризм Физика Философия Финансы Химия Черчение Экология Экономика Электроника

Part III





Short-bored piled foundations are used 1)_____ small houses and lightweight framed buildings constructed 2) _____ soils that expand and contract 3) _____ changes in the moisture content. These soil types include clay and black cotton.

The type of foundation shown in Figure 8.8 can be constructed quite quickly and avoid the need to dig deep trenches. Short-bored piles are more effective and cheaper than conventional foundations if the soil responds easily to the changes 4) _____ the atmosphere.

 

Figure 8.8 Short-bored Pile Foundation

 

These foundations are not suitable 5) _____ use on rock, flint or sites with many tree roots because the holes must be straight and consistent in diameter.

The holes are dug 6) _____ hands with an auger and then concrete is poured 7) _____ them to form a column in the ground when it hardens. The concrete columns in the holes in the ground are the piles.

The measurements in Table 8.1 are typical dimensions for short-bored piles.

Table 8.1 Measurements for Short-bored Piles

Components Measurements (mm)
Depth of the hole for the piles 2500-3000
Pile diameter 250-360
Pile spacing  
Beam width for 225 mm wall  
Beam depth for 225 mm wall 150-200
Reinforcement diameter 15 mm with 6 mm stirrups

Figure 8.9 Timber Displacement Piles

Figure 8.9 represents timber displacement piles for lightweight buildings. For this foundation straight tree trunks should be used and treated with preservative and sharpened 8) _____ the ends to drive them 9) _____ the ground. It is better to use an auger to remove some 10) _____ the pile-driving process is started.

 

at before by for(x2) in(x2) into on with

 

12 Match the English terms (B) and their definitions (A).

There are two extra terms in column B:

A B
a) lowest load-bearing part of a building, typically below ground level 1. load 2. concrete 3. water table 4. ground 5. foundation 6. pile 7. trench 8.pressure 9.measurement 10. clay
b)the size, length, or amount of something
c) a weight or source of pressure borne by someone or something
d) the level below the surface of the ground where water can be found
e) a long narrow channel that is cut into the ground, for example in order to lay pipes or get rid of water
f) a stiff, sticky fine-grained earth that can be moulded when wet, and is dried and baked to make bricks, pottery, and ceramics
g)building material made from a mixture of broken stone or gravel, sand, cement, and water, which can be spread or poured into moulds and forms a stone-like mass on hardening
h)a heavy stake or post driven vertically into the bed of a river, soft ground, etc., to support the foundations of a superstructure

13 a)Fill in the table with the information from the text given and your additional info:

Foundation Material Measurements Application Additional Info
         

b) Say whether these statements are true (T) or false (F):

1. The natural foundation is the ground underneath the artificial foundation.

2. Artificial foundations ensure the stability of the building.

3. Load-bearing walls require strip or deep strip foundation.

4. Columns and piers require pad foundations.

5. Light loads or poor soil conditions require raft foundations.

6. Very poor conditions such as clay and sand require piled foundations.

7. The size of a foundation is determined by the pressure of the load and the strength of the soil.

8. Stepped foundations are used on sloping sites to reduce costs.

9. Piles can be: replacement piles at that are concrete-filled holes; displacement piles that are timbers driven into the ground.

 

LISTENING

 


14 Audio “How to Lay Foundations”.

Listen to the information twice and be ready to answer the questions below (1-7):

1. Is it a hard job to dig a foundation?

2. Why is it necessary to dig a foundation properly?

3. What main instruments and materials are needed for foundation digging?

4. What are the parameters of footings for small walls?

5. How are trenches marked?

6. For what period should concrete be dried?

7. What are the main steps of foundation laying?

 

VIDEO

 


15 Watch the video and present the main idea of each episode in 4-5 sentences using the expressions from Appendix 2.

WRITING


16 Render the text in English using the expressions from Appendix 2:







Дата добавления: 2014-11-10; просмотров: 2267. Нарушение авторских прав; Мы поможем в написании вашей работы!




Шрифт зодчего Шрифт зодчего состоит из прописных (заглавных), строчных букв и цифр...


Картограммы и картодиаграммы Картограммы и картодиаграммы применяются для изображения географической характеристики изучаемых явлений...


Практические расчеты на срез и смятие При изучении темы обратите внимание на основные расчетные предпосылки и условности расчета...


Функция спроса населения на данный товар Функция спроса населения на данный товар: Qd=7-Р. Функция предложения: Qs= -5+2Р,где...

Реформы П.А.Столыпина Сегодня уже никто не сомневается в том, что экономическая политика П...

Виды нарушений опорно-двигательного аппарата у детей В общеупотребительном значении нарушение опорно-двигательного аппарата (ОДА) идентифицируется с нарушениями двигательных функций и определенными органическими поражениями (дефектами)...

Особенности массовой коммуникации Развитие средств связи и информации привело к возникновению явления массовой коммуникации...

Кран машиниста усл. № 394 – назначение и устройство Кран машиниста условный номер 394 предназначен для управления тормозами поезда...

Приложение Г: Особенности заполнение справки формы ву-45   После выполнения полного опробования тормозов, а так же после сокращенного, если предварительно на станции было произведено полное опробование тормозов состава от стационарной установки с автоматической регистрацией параметров или без...

Измерение следующих дефектов: ползун, выщербина, неравномерный прокат, равномерный прокат, кольцевая выработка, откол обода колеса, тонкий гребень, протёртость средней части оси Величину проката определяют с помощью вертикального движка 2 сухаря 3 шаблона 1 по кругу катания...

Studopedia.info - Студопедия - 2014-2024 год . (0.01 сек.) русская версия | украинская версия